Busbaneswar: busbaneswar City CompanyBMC)
On Monday, as part of the center, solar street lights were installed in the experiment
Solar City project.
The stretch light installed between Delta and OUAT square will cost about Rs 1. 14 crore.
Joint Energy Department for new energy and renewable energy (MNRE)
The source said it would bear 30% of the project cost.
BMC was incorporated into the MNRE project in 2011, which will turn 60 cities including the Bhutan War into solar cities.
"The project is supported by the Ministry of Science and Technology and the Audi Sha Renewable Energy Development Bureau (OREDA)
"BMC Commissioner Sanjib Mishra met.
He said it would only cost Rs 20 if BMC did not have normal lighting.
"Although in
From a time perspective, the cost of installing a solar lamp is quite high, as BMC has to pay 70% of the total cost, but it will be beneficial in the long run.
"Money spent on electricity consumption will be saved," the commissioner said.
Currently, BMC spends about Rs 5 a year on street lights.
Solar energy is just an integral part of the Solar City project, he said.
In addition to solar lights, the project also includes photovoltaic, solar hot water, solar cooking, solar steam power generation and solar air-
The commissioner said the air conditioning system.
OREDA has sought 600 square feet of land for the installation of solar panels and batteries.
Download the India Times news app in the latest city.